Work
In Progress
The
Hearst Downtown (or BIA) has many projects in store for the future, and
some we have already started to work on.
Of
course, this list is in constant evolution. Check back often to find out
which projects are on the drawing board, which were started, which were
completed, etc.
Here
is a list of current projects, followed by a short description.
Billboards
outside town
In
2002, the BIA will replace and/or repair the two billboards at each side
of town. This project was not completed in 2002 due to financial
constraints.
Update:
In 2003, the billboards were repaired.
[Back
to top of page]
Christmas
decorations - update
The
Downtown Christmas decorations were 20 years old. In 2002, there
was an agreement between the Town of Hearst and the BIA to undertake the
restauration of the existing decorations and buy new ones. The municipality
payed $7,000 and the BIA did the same for a total of $14,000 for this project.
Update:
More work is being done and storing space has been made at the airport
hangar.
[Back
to top of page]
Sharing
of responsibilites with the Town of Hearst
This
subject is still under discussion between the municipality and the BIA.
[Back
to top of page]
Patios
downtown
One
executive member, while on vacation in Rouyn, saw patios installed on the
sidewalks of the downtown area. He suggested that the same type of
installation be done for the Hearst Downtown (photos
of the town of Rouyn) Your executive has asked the Municipality
to install a sidewalk 1.5 metres wide by 1 or 2 parking spaces long, in
order to surround the patio. The Town of Rouyn paid approximately
$2,825 to install a pretreated wood sidewalk over 2 parking spaces.
The owner of each patio is responsible for the costs of a security fence
surrounding the patio and all other installations. The Municipality
could also adopt a by-law in order to insure that these patios stay within
the norm. Financing for this project is still under discussion between
the BIA and the municipality.
Update:
The Municipality has imposed such restrictions that it is practically impossible
to install patios on George Street. Some entrepreneurs have demonstrated
an interest to install patios on 9th Street... To be followed.
Update:
The Municipality has allowed patios downtown and some business owners have
installed one in front of their business in 2004 and will do the same in
2005.
[Back
to top of page]
Parking
downtown
This
subject is still under discussion between the municipality and the BIA
in order to settle the issue of lack of parking spaces downtown.
[Back
to top of page]
Renovation
of 14 street lamps in the downtown area
As
we remember, the BIA has renovated 12 street lamps, and financed it all,
in 2001. In 2002, the municipality has agreed to renovate the remaining
14 street lamps that were not done in 2001. The municipality will
pay for the total cost of this project.
Update:
The Municipality has not completed this project in 2003. Deferred to 2004.
Update:
The Municipality has not completed this project in 2004. Deferred to 2005.
[Back
to top of page]
Installation
of flower boxes
Install
flower boxes on downtown street corners. The cost for a small box
is $150 and a large one is $300. This projet will require maintenance
all summer long (watering), this could be done by the BIA's summer employee.
[Back
to top of page]
Free
Parking on Weekends
Free
parking on weekends will be discussed at next meetings.